Kanpur

Knocksense Shorts| Construction on Kanpur Metro's Baradevi to Naubasta section started

The 23km long corridor will have 21 metro stations under it. Read on to know more

Knocksense Staff

The construction at the Baradevi to Naubasta elevated section of 23km-long Corridor-1 of the Kanpur Metro Project started on Monday. The total length of the elevated section is 5.42 km, with five stations falling under it- Baradevi, Vasant Vihar, Kidwai Nagar, Baudh Nagar, and Naubasta.

Reportedly, this is the second elevated section of Corridor-1 (IIT to Naubasta) after the 9km-long priority section from IIT to Motijheel, on which metro services are currently operational.

As of now, UPMRCL has successfully completed the tunnelling work on the 84-meter-long segment between Chunniganj and Nayaganj. UPMRCL has planned the construction of the Kanpur Metro in two phases, of which phase 1 includes the construction of a 23 km long metro corridor between IIT Kanpur and Naubasta, while phase 2 includes the construction of the 8 km long corridor from Chandrashekhar Azad University to Barra-8.

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

Light up your Diwali with comedy, beats, and nonstop fun in Mumbai!

IIM Lucknow places 580+ students with stipends soaring to ₹3.95 lakh

No last-minute rush! All Vina Alkohal stores in Lucknow to stay OPEN till 11 PM, this Diwali!

Goldman Sachs taps IIM-A, IIM-L to Scale '10,000 Women' Program in India

Lucknow-Kanpur Rapid Rail Project gets official nod; to boost connectivity and economy

SCROLL FOR NEXT