Lucknow

Be ready to see a better and new Lucknow airport with the grand terminal 3!

Knocksense Staff

The proposal for an integrated terminal at Lucknow airport that has been lying pending since two-years, has now been given a green signal! The news got confirmed after its announcement by Union Minister of Civil Aviation, who also stated the need for it, considering the growth in the number of flyers in both domestic and international flights to and from Chaudhary Charan Singh airport.

The new terminal will be constructed by the Airport Authority of India (AAI) and will be able to handle 4000 passengers instead of the current 600, during peak hours. The new terminal will be able to handle more than 63 lakh passengers, annually and will be made on 1 lakh sqmt area, at an estimated cost of Rs 1230 crore.

[rebelmouse-image 22605339 original_size="1000x666" expand=1]

Proposed features in the upcoming airport terminal

Be ready to see a better and new Lucknow airport with the new and grand terminal 3, that is going to have aerobridges, 24×7 network of CCTV cameras, escalators, integrated entry and exit systems, lifts, security access system and a host of other features.

Other things to cater to the needs of the passengers include-

A premium lounge with shops and eateries, duty-free shops, three underground subways, tourist visa counters, laser scanners for luggage, a large number of baggage handling systems and connectivity with Amausi metro station.

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

Mumbai Metro Line 3 enters final phase; loaded trials set to begin next week

Mumbai monsoons to bring 22 high tides, surging above 4.5 meters; BMC warns of impending flood!

New entry timings announced for Mumbai Coastal Road; stretch to now be open on all days

Level up your makeup game with the enchanting touch of Artistry by Pranisha in Lucknow

Lucknow News | Update on the restoration progress of the historic Rumi Gate

SCROLL FOR NEXT