Lucknow

UPMRC issues detailed alignment map for Lucknow Metro's East-West Corridor

Jatin Shewaramani

The Uttar Pradesh Metro Rail Corporation (UPMRC) has taken a major step towards the construction of Phase 1B, the East-West Corridor of the Lucknow Metro. In the latest update, UPMRC has released the corridor's route map, detailing its elevated and underground stretches.

East-West Corridor to Feature 7 Underground and 5 Elevated Stations

According to the map, seven stations, Charbagh (B), Gautam Buddha Marg, Aminabad, Pandeyganj, City Station, Medical Chauraha and Chowk, will be underground. Meanwhile, Thakurganj, Balaganj, Sarfarajganj, Musabagh and Vasant Kunj will form the elevated section of the corridor. Additionally, UPMRC has floated the tender for the construction of the corridor, with bids scheduled to be opened on July 28. Additionally, a nearly 350-metre-long ramp will be constructed beyond Chowk Metro Station to seamlessly connect the underground section with the elevated corridor.

Once operational, the East-West Corridor will provide faster and more efficient metro connectivity between Charbagh and Vasant Kunj. It is expected to improve access to densely populated areas of Old Lucknow, including the Medical College, while helping ease road congestion and promoting sustainable urban mobility across the city.

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

9 spots in Ahmedabad to get your hands on a good read

Lucknow Weather Alert: Cyclonic rain likely Nov 21-22, temperatures to dip by 4°C

9 Museums in Lucknow to explore the city beyond its famous landmarks

7 legendary matches that gave Kanpur’s Green Park its cricketing glory

Stories, ideas & 100+ artists! Koshala Literature Festival is back in Lucknow from Nov 27–30

SCROLL FOR NEXT