Mumbai

Metro services in Mumbai shut down along Dahanukarwadi - Aarey stretch on Jan 8

Integration work on Mumbai Metro Lines 2A and 7 to be conducted on January 8, 2023, affecting metro services.

Somya Agarwal

Following the integration work on Metro lines 2A (Dahisar to DN Nagar) and Metro Line 7 (Dahisar E to Andheri E), metro services in Mumbai will be affected, announced Mumbai Metropolitan Region Development Authority (MMRDA). Metro services on Phase 1, from Aarey to Dhanukarwadi will remain shut on January 8 between 06:00 AM to 10:00 PM.

The 18.6 KM long, Metro Line 2A from Dahisar to DN Nagar with 17 stations connects Metro Line 1 (Ghatkopar to Versova), the ongoing Metro Lines 2B (DN Nagar to Mandale) and the Metro Line 6 (Swami Samarth Nagar to Vikhroli) as well as Metro Line Line 7.

MMRDA to integrate systems of both lines before inauguration

Before inaugurating the first Phase, MMRDA will carry out drills to integrate systems such as public announcement systems, passenger information display systems, rolling stock with signaling capabilities, telecom and platform screen doors, among others. For this, the operational corridors between Dahnukarwadi and Aarey will have to be closed. 

Once fully operational, these two corridors will carry as many as 3 lakh people each day. These lines are expected to carry over 11 lakh passengers in a day by 2031.

The first phase of Line 7 and Line 2A was launched in April, 2022. Earlier this week, the MMRDA announced that the Metro 2A and 7 will be operational soon for the public soon.  

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

Bookmark THESE 7 landmarks in Bandra, for an exciting day out with your curiosity & camera

Pet Parents in India! Checkout THIS ultimate flight guide for a stress-free journey with pets

ICMR & IIT Kanpur join hands to conduct feasibility study of COVID-19 vaccine delivery using drones

Find your perfect read and your perfect corner at THESE 8 Lucknow spots

Rooted in Dudhwa’s untamed calm, Vanyara by BRIKitt promises mindful, lasting value for investors

SCROLL FOR NEXT