Mumbai

New six-lane Reay Road cable-stayed bridge in Mumbai to be inaugurated on May 13

The cost of the project is ₹273 crore!

Somya Agarwal

Mumbai's first land-based cable-stayed road overbridge at Reay Road will be inaugurated at 7 pm on May 13. This new Reay Road bridge replaces a British-era structure that was demolished in February 2022. The construction was completed by December 2024, within two years. However, it awaited formal inauguration for nearly six months.

During the ceremony, another road overbridge at Titwala will also be inaugurated remotely.

Project specifications

  • Project start date: February 14, 2022

  • Estimated cost: ₹273 crore

  • Total length: 1.52 km

  • Bridge length: 385 m with two down ramps

  • Lanes: 6 lanes with footpaths for pedestrians

Further, the bridge incorporates design and safety features, including vertical clearance for vehicle movement under the Eastern Freeway, an underpass connection via Barrister Nath Pai Road, and a bridge health monitoring system. To enhance its visual appeal, LED lighting has also been installed.

Part of a city-wide bridge modernisation drive

The Reay Road bridge is part of a broader initiative by Maharashtra Rail Infrastructure Development Corporation (MRIDC or Maharail) to replace ageing British-era bridges across Mumbai in coordination with BMC and the Railways. The goal is to build modern cable-stayed bridges adjacent to the old ones, without disrupting traffic.

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

Big boost for Mumbai Metro: 4 new lines, one travel app!

Maharashtra to launch new state-run app-based autos, taxis & e-bikes!

Bad Boy Pizza to Burma Burma! 11 new restaurants in Mumbai, this July

Mumbai’s iconic Shivaji Park to undergo heritage makeover | Details

Lucknow-Gorakhpur travel to be costlier from Aug 1; check new toll rates

SCROLL FOR NEXT