Knocksense: A local content and recommendations platform

{{ subpage.title }}

Mumbai Coastal Road Project to become operational by 2023!

The Brihanmumbia Municipal Corporation is ensuring round-the-clock work for the completion of the Coastal Road Project in Mumbai, by November 2023. A civic official on Thursday informed that the BMC has completed about 40% of work for the first phase of the project, to commission operations within the slated deadline. The designated civic team is reportedly functioning in 3 shifts to hasten the execution of this infrastructure consignment.

Read Now Show less

Mumbai Coastal Road Project: BMC completes 1-km long tunnel boring work with the help of 'Mavala'

Moving closer towards the completion of Mumbai's coastal road project, BMC has successfully drilled over a kilometre-long tunnel using 'Mavala', India's largest Tunnel Boring Machine (TBM). Imported from China, this machine has a 12.9 meter-wide diameter which has hastened the progress of the entire tunnelling work, significantly.

As per reports, BMC began the tunnelling scheme of the coast road project in January 2021, with the aim to carve out 2.07km twin tunnels, each about 70 meter-wide, in 18 months. The work was, however, delayed due to the advent of the 'second wave' of the pandemic, and the consequent city-wide restrictions in March 2021.

Read Now Show less

Latest