raju pawar
Indore

Knocksense Shorts | Trial runs for Indore metro commence; To become operational in the next 5 months

The first technical trial run was flagged from the Gandhi Nagar depot.

Aditya Vikram

The time for seamless commute across the city is inching closer. The first trial run of the Indore metro was flagged off from the Gandhi Nagar depot on Saturday, September 30. The said run was conducted between the Gandhi Nagar Depot and the Super corridor-3 metro station.

After the trial run, Indore Metro's commercial operations are estimated to begin in the next five months. Once operational, the Indore metro line will operate across 31.5 kilometers, covering 29 stations on its path.

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

Lehengas, juttis, jewellery and more: The Ahmedabad shaadi shopping guide

Mumbai-Ahmedabad bullet train to change tracks at 320 kmph with new technology

Getting married in Lucknow? Bookmark this before you start shopping

Rain, rhythm & nostalgia: Baarish is bringing a one-of-a-kind evening to Lucknow this Saturday

Picture abhi baaki hai: Lucknow Film Festival brings AI, animation & gaming to Lucknow on Oct 23–24!

SCROLL FOR NEXT