Mumbai

Mumbai’s BKC-LBS Marg Flyover closed for pothole repairs; know details

The flyover was inaugurated on February 23, 2023.

Khushboo Ali

The flyover connecting Bandra Kurla Complex to Lal Bahadur Shastri Marg, inaugurated on February 23, 2023, has been closed for urgent repairs due to severe potholes. The Mumbai Metropolitan Region Development Authority (MMRDA) has imposed a hefty fine of ₹50 lakhs on the contractor, J Kumar Infraprojects, with an additional ₹10 lakhs per day the flyover remains closed.

This is not the first time the contractor has faced penalties for this project. In 2022, they were fined ₹1 crore for safety lapses leading to a collapse during construction. The project consultants, PADECO, have also been issued notices, and an MMRDA deputy engineer faces a show cause notice.

The 1.25 km long, 8-meter wide ramp's poor condition highlights ongoing infrastructure challenges in Mumbai, raising questions about construction quality and maintenance practices.

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

Ikaai’s Festive Edit returns to Lucknow with 50+ stalls for fashion, gifts & more!

Lucknow’s Indira Gandhi Planetarium is back, but does it still spark wonder?

Lucknow Metro's East-West Corridor construction to begin by March 2026

Skip the Bandra Fair crowd! Try THESE 7 food delivery options

Monsoon back in action; expect heavier showers in Lucknow this week

SCROLL FOR NEXT