Mumbai

Mumbai’s BKC-LBS Marg Flyover closed for pothole repairs; know details

The flyover was inaugurated on February 23, 2023.

Khushboo Ali

The flyover connecting Bandra Kurla Complex to Lal Bahadur Shastri Marg, inaugurated on February 23, 2023, has been closed for urgent repairs due to severe potholes. The Mumbai Metropolitan Region Development Authority (MMRDA) has imposed a hefty fine of ₹50 lakhs on the contractor, J Kumar Infraprojects, with an additional ₹10 lakhs per day the flyover remains closed.

This is not the first time the contractor has faced penalties for this project. In 2022, they were fined ₹1 crore for safety lapses leading to a collapse during construction. The project consultants, PADECO, have also been issued notices, and an MMRDA deputy engineer faces a show cause notice.

The 1.25 km long, 8-meter wide ramp's poor condition highlights ongoing infrastructure challenges in Mumbai, raising questions about construction quality and maintenance practices.

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

Where to invest in Lucknow: 7 upcoming property picks for 2026

Tunday’s the GOAT, but meet Lucknow's 11 other messy, must-try Roll masters

Pet Parents in India! Checkout THIS ultimate flight guide for a stress-free journey with pets

It’s the 'Season of Smiles' at Lulu Mall! A blue, sparkly, festive take on Christmas

ICMR & IIT Kanpur join hands to conduct feasibility study of COVID-19 vaccine delivery using drones

SCROLL FOR NEXT