Mumbai

Second phase of Mumbai Coastal Road between Worli and Marine Drive to be operational by June 10

The southbound tunnel faced issues related to leakages at 2-3 expansion joints.

Khushboo Ali

The second phase of the Mumbai Coastal Road Project, connecting Worli and Marine Drive, will be open to traffic by June 10, as per reports. Further, on May 28, officials inspected the southbound tunnel at Marine Drive, a part of the first phase inaugurated in March, to address issues related to leakages at two to three expansion joints.

Repair work will not disrupt traffic flow

Reportedly, the leaks would be fixed using polymer grouting, and it is also suggested that such polymer content should be applied to all 25 joints on each side of the tunnel to prevent future seepage, especially during the monsoon season. It is also stated that the repair work will not disrupt traffic flow, ensuring motorists face no inconvenience. This comes as part of efforts to maintain the coastal road's integrity and usability.

The coastal road project is a significant infrastructure development aimed at easing traffic congestion in Mumbai, enhancing connectivity between key areas of the city.

To get all the latest content, download our mobile application. Available for both iOS & Android devices. 

265 flights, two airports: CSMIA’s proposed Navi Mumbai flight shift put on hold

Kanpur Metro to ply between IIT and Naubasta before Diwali; more trains added to the fleet

7 places in Kanpur for Ravan Dahan, fireworks & festive fun

9 places to catch Ravan Dahan and soak in Lucknow’s Dussehra spirit

Lucknow Film Festival Season 4 & Imaginarium 2026 returns on October 23–24

SCROLL FOR NEXT