Knocksense: A local content and recommendations platform

{{ subpage.title }}

​Road diversions set up for metro construction in Kanpur's Chunni Ganj area

As phase two of Kanpur Metro's construction gets underway, work on the proposed underground Chunni Ganj station will begin soon. To facilitate this process, road diversions were put in place on a trial basis on Tuesday. This was done by setting up barriers and roadblocks at various junctions. Traffic Police and Metro Marshalls were stationed to ensure the smooth flow of traffic. Despite these arrangements, travellers experienced slow traffic in the area.

Read Now Show less

New 6-lane flyover between Kanpur & Prayagraj to become operational in 6 months

Easing connectivity in Uttar Pradesh, a new flyover is set to become operational between Kanpur and Prayagraj in about 6 months. The upcoming 6-lane stretch will permit a speed limit of 100km/hour, reducing the transit time to just 2 hours and 15 minutes. However, this speed will come at the cost of about 20% higher tolls, read reports.

Read Now Show less

Kanpur to get a new elevated road between Civil Lines & Ghantaghar Chauraha

In an attempt to improve the traffic situation in Kanpur, the city authorities have come up with a new initiative. As a part of this project, an elevated road will be constructed on a stretch running between UP Stock Exchange in Civil Lines and the Ghantaghar Chauraha. Reportedly, a high-level development committee will prepare the framework for this elevated road, which will be a four-lane stretch supported by the road pillars.

Read Now Show less

To be known as NE-6, Lucknow-Kanpur Expressway work to begin in July 2021

The 63km long Lucknow-Kanpur Expressway will begin pivotal construction work in July this year and will be known as NE-6, read reports. Starting from Shaheed Path in Lucknow, the expressway will map through the Unnao district and will be linked to the proposed ring road in Kanpur. Reportedly budgeted at ₹4,700 crore, this expressway will be able to cut down transit time between Lucknow and Kanpur from 2 hours to just 50 minutes.

Read Now Show less

Beautification project to begin soon at Kanpur's Fazalganj crossing

In view of intense lock-ins and traffic jams at Kanpur's prominent intersections, a report, proposing constructions of flyovers at Vijayanagar, Fazal Ganj, Govindpuri Jaipuria school crossing was filed at the Madalyukta. However, the conclusive analysis of a survey reveals that there is no need to build a flyover at the Fazalganj intersection if there is one us at Vijayanagar. Conducted on the proposal of a district MP, this Mandalyukta survey has paved the way for the beautification and widening of the intersection to declutter roads. A proposal in this regard will be floated at the Mandalyukta soon.

Read Now Show less

Latest